REAL WIRING REFRIGERATION AUTOMATIC CONTROL EQUIPMENT
KTE-4000SQ
Equipment Introduction
-
Wiring sequence experimental equipment is a portable control panel that can be connected to the control panel of compact equipment such as KTE-1000BA, KTE-3000HD and so on.
-
Associated control panel kit for each refrigeration equipment
-
Training sequence based on : Available for practicing and experiment of basic wiring or application circuit for electric power refrigeration step by step
-
Training design variable circuit : Available for practicing and experiment of designing variable application circuit by using control devices such as Magnetic contactor(MC), Relay(Relay), Push Button Switch(PB), Select Switch(S/SW), Toggle Switch(T/S), Buzzer, Timer(T), Defrosting Timer(D-T), Power lamp(PL), Running lamp(RL), and Stop lamp(GL)
-
Training wiring work : Wiring and test training available with banana jack cables
-
Stability : Available for training and experiment of wiring by adapt power DC24V with stability
-
Wiring practice with banana jack cables with easy and simple : Wiring training available by using wire as banana jack cable
Equipment Characteristics
-
Temperature, pressure, power control and defrost control are linked to boiler, fire equipment, building automatic equipment operation equipment, and all work circuits of industrial equipment automation practical textbooks such as air conditioning, refrigeration, and automatic control can be tested and practiced.
-
Electrical power wiring and refrigeration basics, application circuits can be tested step by step.
-
After direct wiring work on the air conditioning refrigeration actual wiring equipment with actual wiring or banana jacks, testing is possible.
-
Easy and simple wiring practice is possible by inserting banana jacks as well as wiring work using wires.
Education Contents
-
Configuration switch circuit for refrigeration system
-
Understand the working principle and composition of Relay device
-
Understand the working principle and composition of a magnetic contactor (MC) device
-
Understand the working principle and composition of a thermal relay (THR) device
-
Understanding the principle and operation of a temporary timer of the circuit wiring
-
Understanding the temporary action and the sequent return of a temporary timer and wiring the circuit.
-
Configurating and operating a hot gas defrosting and pump down circuit.
System Description
Schematic Diagram
(1) Breaker / (2) 8-pin relay / (3) 60-sec timer / (4) Flicker relay / (5) MC / (6) Thermal relay / (7) 11-pin relay / (8) 24-h timer / (9) Lamp / (10) Push-button S/W, Lamp / (11) Push-button A,B contact / (12) Push-button A contact / (13) Select switch / (14) Toggle switch / (15) Buzzer / (16) DC motor / (17) Load lamp / (18) Connectable port / (19) Terminal base
Equipment Application
-
Available for training and practicing of sequence control through load part (Lamp, Buzzer, and motor) that is installed interior of a air-conditioning refrigeration wiring training kit.
-
Each refrigeration apparatus can work by connecting it to an air-conditioning refrigeration wiring training kit that had been set up sequence circuit with real wire or banana plugs.
Video Clips for Product Usage